Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13668639
| No.13668639
- Product Categories
- High-pressure pump pipe red..
- Boom Boom tube wear and abr..
- Kyushu tubing pump tube wea..
- Anti-corrosion steel
- Friendly Links
| Information Name: | Low-pressure pump to pump straight to bend the fabric machine manufacturers |
| Published: | 2015-03-15 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 50000.00 |
| Price Description: | |
| Detailed Product Description: | Wearable vital concrete pump pipe installation and commissioning, on how to use the on-site construction of good concrete wear pump tube is directly related to the progress and quality of the project, the author set many years of concrete pump design, production technology and on-site construction of accumulation experience this make some extensive overview. When installing concrete pump source to test concrete. If it is concrete, mixer truck feeding, conveying pipe wear pump may be installed, as long as you can easily take over and feed. If the on-site mixing of concrete, the first to determine the position of the mixer and the mixer according to the venue on the feeding method, and then to determine the location of the concrete mixer pump discharge according to the height and wear pump tube for feeding and takeover requirements. 1. First, the concrete pump is placed on a solid concrete floor or pier, to maintain the level, and the four legs of the pump machine locking pins and safety pins, remove the tire or tires off the ground. 2. A chute according to do stirrer spout and pump tube wear hopper, so that the material entering the mixer discharged by the pump hopper chute. 3. usually chute angle as skeleton, welded steel with 1.5mm thick. Here chute set up with support to make it secure. 4. Typically, in the hopper of the machine need to wear pump heightening about 20cm, so hopper volume increase, in order to ensure the concrete will not drain. Because the best time compulsory mixer discharge emptied, so the flow of concrete into the hopper more evenly. If the sub-sub-discharge, the last ones out of the concrete stones, to pumping negative, especially when a large concrete slump, it should be noted, so the hopper pump to be heightened. If it is a large-capacity blender, you can do a hopper in advance, in order to ensure continuous supply. 5. Place on a chute, require proper slope, the inclination angle is preferably between 25 ° -40 °, the gap is not too large. 6. chute connected to the pump hopper, chute and hopper want to leave some space for easy cleaning bucket and sieve. 7. Once in place, look at the whole, to ensure delivery pipe casing wear pump door switch freely, easy maintenance operations. |
Admin>>>
You are the 9765 visitor
Copyright © GuangDong ICP No. 10089450, Yanshan Kyushu Pump Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 9765 visitor
Copyright © GuangDong ICP No. 10089450, Yanshan Kyushu Pump Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

